OA | Tel:+86-18695852799
National Highway 310 project road mechanical and electrical engineering
The starting point of the reconstruction project of the southwest section of Zhengzhou of National Highway 310 is located at the junction of Zhongmu County and Guancheng District on the west side of Xiangyun Temple in Zhongmu County, passing through Guancheng District, Xinzheng City, Erqi District, Xinmi City and Xingyang City from east to west, and ending in Gongyi The junction, with a total length of 52.745 kilometers. The two-way six-lane first-class highway technical standard is adopted, and the design speed is 100 km/h.
Our company undertook the mechanical and electrical part 2 of the reconstruction project at the southwest end of Zhengzhou on National Highway 310. The intelligent system engineering part includes: video surveillance system, information release (information board) system, traffic event (microwave vehicle inspection) detection system, safety warning system, intersection vehicles, pedestrian traffic light indicating system, communication system optical cable pipeline pipeline, Remote power supply and other systems.
Recommended
Contact us
Address: 1913, Block B, Greenland Window, at the intersection of Dongfeng Road and Qili Henan Road, Zhengzhou City
Address: Room 302-305, 3rd Floor, Building 4, No. 138, Hehuan Street, Zhengzhou High-tech Industrial Development Zone